PROJECTS

COMMISSIONED SOLAR PROJECTS
Name of the Project
Capacity
(in MW)
Status
Grid connected Ground based solar project
22
Commissioned at Manmunda in Boudh District.
01
Commissioned at Mukhiguda in Kalahandi District.
Grid connected Rooftop Solar Project, MNRE
4
Commissioned in March 2019 on 65 Govt. buildings in
Bhubaneswar (39) & Cuttack (26) on PPP mode.
ONGOING SOLAR PROJECTS OF GEDCOL
Name of the Project
Capacity
(in MW)
Status
Ground-Mounted Solar Project
8
  • Contract Agreement was executed with M/s SunSource Energy Pvt Ltd. in June 2020 for development of 8MW ground mounted solar project at 5 sites of OPTCL grid sub-station: Baripada, New Bolangir & Jaynagar and OHPC & GEDCOL Plant-Mukhiguda & Manamunda.
  • Out of five nos. of sites, two sites i.e. 02 MW PVSPP at Manmunda & 01 MW PVSPP at Mukhiguda has been commissioned. Installation work at other three sites has been completed, power evacuation work is going on and sites will be commissioned shortly.

Ground mounted Solar Project at Chipilima
10

Notice inviting Tender for setting up of 10 MW Grid Connected Solar Power project at Chiplima was floated on 03.01.2022 and the last date of submission of tender was 31.05.2022. Total five numbers of Bidders have participated in the tender and after the tender evaluation, the tender was cancelled and re-tendering process is going on.

Ground Mounted Solar PV Project at Boudh District.
55-60
  • Agreement to lease has been signed on 09.09.2022 in between IDCO & GEDCOL.
  • The DPR preparation is under process.

SMALL HYDRO ELECTRIC PROJECT
Name of the Project
Capacity
(in MW)
Status
Kanupur Small Hydro Project, Keonjhar
4.2
  • DPR & Tender documents prepared and submitted by M/s WAPCOS.
  • Project will be taken up after completion of river gap closing work by DoWR.
Jambhira Small Hydro Project, Mayurbhanj
3
  • DPR & Tender documents prepared and submitted by M/s WAPCOS.
  • Project will be taken up after getting confirmation of Water availability from Department of Water Resources, the work will be carried out by GEDCOL.
Telengiri Dam Toe SHEP in Koraput District
1.2

Work Order has been issued on 26.09.2022 to M/s WAPCOS for preparation of DPR.

Galigaddar Water fall in Kotia Panchayat of Koraput district in the state of Odisha
---

Work Order has been issued on 26.09.2022 to M/s WAPCOS for preparation of Feasibility Report.

Feasibility Report for following 5 (five) nos. of SHEP
51.51

Work order has been issued on 21.01.2022 for preparation of Feasibility Report for following 5 (five) nos. of SHEP in different district of Odisha. Draft FR for 05 nos. of SHEP has been submitted by M/s WAPCOS on 26.12.2022.

Sl No.
Name of the Project
District
Name of the River
(in MW)
Approximate
Capacity
(in MW)
01 Kandhamuni Sundargarh Brahamani 18
02 Bhitarajhola Rayagada Nagabali 7
03 Jiranga Gajapati Mahendra
Tanaya
5
04 Kussa Kandhamal Bagh 12
01 Kumbising Ganjam Bahuda 9.51
Total Capacity in MW
51.51
FLOATING SOLAR PROJECTS
Pre-Feasibility Report by EU Consortium
  • European Union Consortium has conducted studies on 12 hydro & irrigation reservoirs in the State and prepared PFR for approximately 5040 MW floating solar potential on 17,800 acres of water surface area in Nov. 2019
  • DPR for 2 large scale reservoirs in Hirakud and Indravati with capacity of 500 MW & 160 MW respectively has been prepared by European Union.
PROJECTS TO BE DEVELOPED UNDER JV MODE
Name of the Project
Capacity
(in MW)
Status
Mandira Small Hydro Project, Sundargarh
to be developed under JV mode with SAIL
10
  • JV formed with SAIL in Sept 2018, namely GEDCOL SAIL POWER CORPORATION LTD (GSPCL) with 74:26 share-holding.
  • The project cost is Approx. Rs.100 Crores.
  • The Letter of Intent has been issued on 23.07.2021 and the Contract Agreement has been signed between GSPCL and HIPL-RSVCPL (JV) on 08.09.2021.
  • M/s WAPCOS has been engaged as Project Management Consultancy (PMC)
  • The project construction work is going on.
Floating Solar Project with NHPC,
UMREPP Scheme, MNRE
500
  • MOU executed with NHPC on 20/07/2020.
  • Project will be taken up in Joint Venture mode with NHPC.
  • The Promoters agreement, MoA and AoA has been signed on 04.01.2022 for formation of JV Company.
  • In the 1st Phase the JV Company is going to implement 300 MW Solar projects on Rengali Reservoir with MNRE approval which will start generating Solar Power within coming two years. GEDCOL has conveyed its consent to NHPC re-tendering on behalf of JV company.