PROJECTS

COMMISSIONED SOLAR PROJECTS
Name of the Project
Capacity
(in MW)
Status
Grid connected Ground based solar project
22
Commissioned at Manmunda in Boudh District.
01
Commissioned at Mukhiguda in Kalahandi District.
02
Commissioned at New Bolangir Grid Substation in Bolangir District.
01
Commissioned at Baripada Grid Substation in Mayurbhanj District.
02
Commissioned at Jayanagar Grid Substation in Koraput District
Grid connected Rooftop Solar Project, MNRE
4
Commissioned in March 2019 on 65 Govt. buildings in
Bhubaneswar (39) & Cuttack (26) on PPP mode.
ONGOING SOLAR PROJECTS OF GEDCOL
Name of the Project
Capacity
(in MW)
Status
Ground mounted Solar Project at Chipilima
10

Project will be taken up shortly.

Ground Mounted Solar PV Project at Boudh District.
55-60
  • Agreement to lease has been signed on 09.09.2022 in between IDCO & GEDCOL.
  • The DPR preparation is under process.

  • This project will be implemented on Tariff based competitive bidding process.

SMALL HYDRO ELECTRIC PROJECT
Name of the Project
Capacity
(in MW)
Status
Kanupur Small Hydro Project, Keonjhar
4.2
  • The DPR to be revised based on the discharge recommended by DoWR, for firming of installed capacity.
  • Project will be taken up after completion of river gap closing work by DoWR.
Jambhira Small Hydro Project, Mayurbhanj
3

Project will be taken up after getting confirmation of Water availability from Department of Water Resourcesas the water availability depends on construction of Ichha dam (in Jharkhand) which is in the upstream of the Jambhira dam.

Telengiri Dam Toe SHEP in Koraput District
1.2

Work Order has been issued to M/s WAPCOS for preparation of DPR. DPR preparation is under progress.

Galigaddar Water fall in Kotia Panchayat of Koraput district in the state of Odisha
---

Work Order has been issued on 26.09.2022 to M/s WAPCOS for preparation of Feasibility Report.

Feasibility Report for following 5 (five) nos. of SHEP
64.5

Draft FR for the following projects has been submitted by WAPCOS for views and comments.

Sl No.
Name of the Project
District
Name of the River
(in MW)
Approximate
Capacity
(in MW)
01 Kandhamuni Sundargarh Brahamani 24
02 Bhitarajhola Rayagada Nagabali 11
03 Jiranga Gajapati Mahendra
Tanaya
5.5
04 Kussa Kandhamal Bagh 12
01 Kumbising Ganjam Bahuda 12
Total Capacity in MW
64.5

Views and comments of GEDCOL & GRIDCO (State Nodal Agency) has already been communicated to WAPCOS for preparation of final FR. WAPCOS has been requested to review the geotechnical aspect of the draft FR.

FLOATING SOLAR PROJECTS
Pre-Feasibility Report by EU Consortium
  • European Union Consortium has conducted studies on 12 hydro & irrigation reservoirs in the State and prepared PFR for approximately 5040 MW floating solar potential on 17,800 acres of water surface area in Nov. 2019
  • DPR for 2 large scale reservoirs in Hirakud and Indravati with capacity of 500 MW & 160 MW respectively has been prepared by European Union.
  • As per decision of 4th SWC, the proposal will be re-submitted after discussion with RE Nodal Agency GRIDCO, OPTCL and Water Resource Department.
PROJECTS TO BE DEVELOPED UNDER JV MODE
Name of the Project
Capacity
(in MW)
Status
Mandira Small Hydro Project, Sundargarh
to be developed under JV mode with SAIL
10
  • JV formed with SAIL in Sept 2018, namely GEDCOL SAIL POWER CORPORATION LTD (GSPCL) with 74:26 share-holding.
  • The project cost is Approx. Rs.100 Crores.
  • The Letter of Intent has been issued on 23.07.2021 and the Contract Agreement has been signed between GSPCL and HIPL-RSVCPL (JV) on 08.09.2021.
  • M/s WAPCOS has been engaged as Project Management Consultancy (PMC)
  • Zero date of the EPC Contract has been commenced from 16.03.2022 and the project execution work are going on.
Floating Solar Project with NHPC,
UMREPP Scheme, MNRE
500
  • MOU executed with NHPC on 20/07/2020.
  • Project will be taken up in Joint Venture mode with NHPC.
  • The Promoters agreement, MoA and AoA has been signed on 04.01.2022 for formation of JV Company.
  • In the 1st Phase the JV Company is going to implement 300 MW Solar projects on Rengali Reservoir with MNRE approval which will start generating Solar Power within coming two years. GEDCOL has conveyed its consent to NHPC re-tendering on behalf of JV company.

  • Re-tender was floated on 05.04.2023 & BHEL was the single bidder. Price bid opened on 01.09.2023 and price negotiation is under progress.